//diy/
soil nailing. my wall footer is exposed, i tried reversing the grade, but damage is done. plan is to dig about 2m instead of 4m and then repoint the wall. im struggling to dig a diagonal bore so i plan to extend my drill with some pvc. have you tried boring a few meters, how did you do it?
Showing all 3 replies.
>>
File: sond.jpg (247.7 KB)
247.7 KB
>>2991554
>boring a few meters
if you don't have pic related, you are not going to achieve much - hand auger don't really go bellow 35-50cm. Your option is to hire a mini excavator and dig a trench around the perimeter, and lay a retention wall from bricks.
>>
>>2991554
>pvc
You'll learn the hard way why >>2991639 exist
Even hand turned soil augers only go 85-100cm deep, the further down you go the harder and more compact the soil is
It will fuck up a hardened steel hand tool, I'm pretty sure PVC will rip itself apart when you go deep enough
>>
>>2991651
one lift would be enough.
>>2991639
i like the idea of putting in a retaining wall probs a MSE, geogrid alternatives are cheaper than rebar.

i discussed it with my better half and she reckons that a dry soil nail reduces risk, i can rent a rotary hammer and put something in without digging, shear strength of the rebar is the only and square cube law screws my friction/penetration depth. concern is the bore hole equivalent of a gopher hole will collapse the hill, i might have exaggerated the risk to loosen the purse strings whoops. i have been watching pvc well digging is it that easy?

Reply to Thread #2991554


Supported: JPG, PNG, GIF, WebP, WebM, MP4, MP3 (max 4MB)